Time and Motion Study for Reducing Cycle Time of Planetary Carrier

Author(s):

Kate Hanamant R. , D Y PATI COLLEGE OF ENGINEERING AMBI PUNE; Suryawanshi Tushar T., D Y PATI COLLEGE OF ENGINEERING AMBI PUNE; Kulkarni Aniket D., D Y PATI COLLEGE OF ENGINEERING AMBI PUNE; Hasabe Mahesh M., D Y PATI COLLEGE OF ENGINEERING AMBI PUNE; Mulik Vinod V., D Y PATI COLLEGE OF ENGINEERING AMBI PUNE

Keywords:

Time and motion study, Productivity, Man power factor, Time standard

Abstract

The main objective of this paper is to increase the production rate. In industries to make the shipment in exact time it is very necessary to set a target for production department. The total work of the production department is completed by different operator so without standard target it is impossible to reach the goal. To increase the productivity of planetary carrier studied on time and motion study by using systematic observation, interview with discussion and stopwatch time study. Time and motion study terms are used as a interchangeably for study of conservation of human resources for doing task by most efficient method. Work study is scientific research involving work techniques with the objective of identifying the best way of doing a work to improve its operational and production efficiency.

Other Details

Paper ID: IJSRDV5I40040
Published in: Volume : 5, Issue : 4
Publication Date: 01/07/2017
Page(s): 69-73

Article Preview

Download Article