Comparative Analysis of an Ongoing Project with Same Type of Project Done in Past to Prepare a Best Scheduling of a Project

Author(s):

Vaibhav Thakur , patel college bhopal; Vinay Singh, patel college

Keywords:

Planning, Scheduling, Resource Allocation, PMC, MSP, Durations

Abstract

The Objectives of this study is to prepare scheduling for ongoing project to compare the actual project done in past of same aspects in terms of planning and scheduling in terms of time & cost. The project in past was subjected to a financial break up as a result, delay of project was observed. Now assuming that if financial break ups would not have occurred & allocation of resources would have by taking CPWD rates 2016 then, best result was obtained w.r.t. time-cost for each activity in W.B.S. so for upcoming project which has same specification as actual project already done, new project duration, planning and resource allocation is performed & results are studied. Results are giving too main heading’s. (1) Amount saved on activity along with crashing & durations. (2) Amount invested on activity to achieve desired duration. For this, total amount saved on project resource is compared to total amount invested to achieve target duration for upcoming project. Also, indirect cost which includes only the salary packages of PMC is also considered along with resource costing.

Other Details

Paper ID: IJSRDV5I51046
Published in: Volume : 5, Issue : 5
Publication Date: 01/08/2017
Page(s): 881-882