High Impact Factor : 4.396 icon | Submit Manuscript Online icon |

Planning, Analyzing, Designing and Estimating of G+1, 3-BHK Villa

Author(s):

N Kiran Kumar , KUPPAM ENGINEERING COLLEGE; T Venkatachalam, KUPPAM ENGINEERING COLLEGE; T S Tarannum, KUPPAM ENGINEERING COLLEGE; L Pushpa, KUPPAM ENGINEERING COLLEGE; Pathan Riyaz, KUPPAM ENGINEERING COLLEGE

Keywords:

Shear Force, Bending Moment, Deflection, Slabs, Beams, Columns, Footings, Estimate, Standard Schedule, Abstract Estimate, Specifications, Lumpsum, Carpet Area, Quotations

Abstract

The aim of our work is to design, estimate and to calculate the cost of a G+1 3-BHK Villa according to Indian Standard codes. The design of a building can be done manually or with the help of Software. We have selected partial manual and partial software because complete design of manual consumes a lot of time, effort and can contain mistakes whereas, by using partial methods we can save time and obtain results without errors. Generally people go up with software to attain approximate values to avoid manual mistakes. Now a days there are several softwares are available in market for analysis and design of Civil Engineering structures‟ like ETABS, STAAD Pro and STRUDS etc., At present work we used software named “STAAD PRO‟ for partial software design. The major use of this software is for the final cross check of analysed results. Estimating is the technique of calculating/computing the various quantities and the expected expenditure to be incurred on a particular work/ project. For all engineering works it is required to know beforehand the probable cost of construction known as the estimated cost. Necessary for preparing an estimate are drawings like plan, elevation and sections of important points, detailed specifications about workmanship& properties of materials, Standard schedule of rates of the current year. Estimate is required to invite the tenders and Quotations and to arrange contract, also required to control the expenditure during the execution of work. Estimate decides whether the proposed plan matches the funds available or not. In this project we estimate the quantities required for the construction of the individual villa and later calculate the cost by preparing the abstract of cost.

Other Details

Paper ID: IJSRDV7I21306
Published in: Volume : 7, Issue : 2
Publication Date: 01/05/2019
Page(s): 1654-1663

Article Preview