Design of Prestressed Balance Cantilever Bridge near Aqua Duct Gomati River: A Case-Study |
Author(s): |
Atul Kumar Pandey , BBD NITM Lucknow; Anoushka Yadav, BBD NITM Lucknow; Anwarul Mustafa, BBD NITM Lucknow; Ankur Patel, BBD NITM Lucknow; Ashwani Pandey, BBD NITM Lucknow |
Keywords: |
Cantilever Bridge, Aqua Duct, Gomati River |
Abstract |
Prestressed concrete box-girder bridges built using the cantilever method are designed for spans between 60 m and 300 m in length. This technique has to compete with a numeral of dissimilar solutions operating within this genuine wide range of spans. They are in competition with girder bridges with a complex concrete and steel framework. If the geometry of the supported road having compatibility, they also have to compete with incrementally-launched bridges completed from prestressed concrete, which are frugally viable for spans of between 35 and 70 m. |
Other Details |
Paper ID: IJSRDV8I30510 Published in: Volume : 8, Issue : 3 Publication Date: 01/06/2020 Page(s): 328-331 |
Article Preview |
|
|