High Impact Factor : 4.396 icon | Submit Manuscript Online icon |

Analyze Significant Factors Causing Delay of Construction Project Management

Author(s):

Akash Pandey , IPSCTM, ; Manoj Sharma, IPSCTM; B.P.Mudgal, IPSCTM

Keywords:

Construction Project, Project Management, Factors, Construction Industry, Questionnaire, Cronbach’s Alpha

Abstract

The objective of this research is to review the project management of construction projects in India. Construction sector is taken into account as an important sector in today’s economy, thanks to the event in construction which is happening within the world generally and therefore the India. The development sector features a great importance not only to the economic and social life, but also to the requirements and inspiration of the local culture. This study stressed on many aspects on the topic of project management in terms of problems and impediments, and suggested solutions through this research, so as to motivate and develop the management of the projects. The researcher used mainly qualitative method and partly quantitative methods to finish the research add the study.

Other Details

Paper ID: IJSRDV8I10849
Published in: Volume : 8, Issue : 1
Publication Date: 01/04/2020
Page(s): 975-981

Article Preview

Download Article