High Impact Factor : 4.396 icon | Submit Manuscript Online icon |

Cross Drainage Work

Author(s):

Poonam Kahar , Annie Institute of Technology & Research Centre ,Chhindwara (MP); Neha Karade , Annie Institute of Technology & Research Centre ,Chhindwara (MP); Roshni Soni, Annie Institute of Technology & Research Centre ,Chhindwara (MP)

Keywords:

Aqueduct, Siphon Aqueduct, Super Passeage, Siphon Super Passage, Level Crossing Outlet and Inlet Crossing, Canal

Abstract

The site condition of the crossing point maybe such that without any suitable structure the water og the canal and drainage cannot be divered to their natural direction. So the cross drainage work must be maintain their natural direction of flow and running the irrigation system.

Other Details

Paper ID: IJSRDV10I10099
Published in: Volume : 10, Issue : 1
Publication Date: 01/04/2022
Page(s): 262-263

Article Preview

Download Article