High Impact Factor : 4.396 icon | Submit Manuscript Online icon |

Transmission line loadability improvement by reactive support

Author(s):

C.R.Patel , L.E.College,Morbi,Gujarat,India; R.H.Bhesdadiya, L.E.College,Morbi,Gujarat,India

Keywords:

Total Transfer Capability , ATC, Loadability Improvement , Reactive Support.

Abstract

The recent trend is towards the deregulation in power markets around the world, transfer capability computation emerges as a key issue in running power system smoothly with multiple transactions and reactive power sources. Total Transfer Capability (TTC) is usually limited by overloaded transmission lines and voltage limits imposed at buses. This paper presents the procedure of ATC calculation and enhancement using powerful power world simulator software considering both thermal limits and voltage limits and enhancement using capacitor placement.

Other Details

Paper ID: IJSRDV2I3691
Published in: Volume : 2, Issue : 3
Publication Date: 01/06/2014
Page(s): 1127-1129

Article Preview

Download Article