High Impact Factor : 4.396 icon | Submit Manuscript Online icon |

Piping For Cooling Water Circulation between Cooling Tower and Condenser

Author(s):

Naved Anjum Ansar Shaikh , Anuradha Engineering Collage; Vijay L Bhambere, Anuradha Engineering Collage

Keywords:

Pfd, p&id, mto

Abstract

In thermal power plant, as we know that exhaust steam from turbine goes to heat recovery unit and from there the exhaust stem goes to the condenser to condense. In shell and tube heat exchanger, cooling water as a cooling medium running inside the tubes whereas steam is inside the shell. So to have sufficient amount of cooling water, we require continuous flow of water from the cooling tower. Our main project aim is to provide a piping between condenser and cooling tower. So in this particular project, we will make basic documents such as pfd, p&id, plot plan, equipment layout, piping ga drawing, isometrics, mto, piping specifications, pump specification, calculations, and stress analysis etc.

Other Details

Paper ID: IJSRDV3I100092
Published in: Volume : 3, Issue : 10
Publication Date: 01/01/2016
Page(s): 379-381

Article Preview

Download Article