Planning, Scheduling and Resource Optimization for A Villa by Using Ms-Project 2010 |
Author(s): |
| Pradeep , student at Nagarjuna College of Engineering and Technology; Dr Rajendra S, Nagarjuna College of Engineering and Technology |
Keywords: |
| Ms Project 2010, CPM, Planning, Software |
Abstract |
|
One of the most challenging jobs that any manager can take on is the management of a large-scale project and it requires numerous activities throughout the project. A Modern project management has developed various techniques based on network techniques in order to plan the projects processes in time, their costs and resources. Critical Path Method (CPM) is one of the best procedures for the planning, scheduling and optimizing the resource usage. CPM scheduling is a basic project control tool hence it is using in the all type of project. Completing a project on time and within the budget is not an easy task. The project scheduling plays an important role in the time and cost aspects of a project. Each project managers have different systems in planning and scheduling, which is usually consists of Gantt chart or Bar chart. The development of Critical Path Method provides a basic and systematic approach to project managers. This results in the use of software’s like Microsoft Project and Primavera. |
Other Details |
|
Paper ID: IJSRDV3I100274 Published in: Volume : 3, Issue : 10 Publication Date: 01/01/2016 Page(s): 1085-1089 |
Article Preview |
|
|
|
|