Construction of a High Level Bridge

Author(s):

S P Salma Begum , SHRI SHIRIDI SAI INSTITUTE OF SCIENCE AND ENGINEERING; K Sreekanth, SHRI SHIRIDI SAI INSTITUTE OF SCIENCE AND ENGINEERING

Keywords:

High Level Bridge, Flood Level, Upstream, Downstream, Environment, Highway

Abstract

The Detail Project Report is an essential building block for any construction project. The DPR is to be prepared carefully and with sufficient details to ensure appraisal, approval, and subsequent implementation in a timely and efficient manner. The detailed project report gives us the clear idea about the existing site conditions and improvements needed to be accomplished. The DPR survey has been done for construction of a high level bridge on road pertaining @ km 6/2 (R&B) road to Kadapa district. The bridge crosses the river in normal crossing. It has total span of 50.80mts.This work has been executed under MNREGS scheme. The bridge has 3 vents of 6.37m effective span. The bridge is constructed across the stream to provide transportation facilities to people of Proddatur to various places of Kadapa District. This stream has an adequate discharge of 97.00 cusecs and it increases more during in rainy season. Traffic studies have been conducted on this road and the outcome was 120cvpd. The maximum flood level of this stream is 99.830.The linear water way is 18.00m. The design drawings and plans were given by MORT&H for execution of work. To calculate the discharge levels has been surveyed around 300mts both upstream and down streams. Funding for this project has been given by the government of A.P. The work has to be completed in a period of one year. The total estimate amount of the project is said to be 69.50 Lakhs.

Other Details

Paper ID: IJSRDV3I100308
Published in: Volume : 3, Issue : 10
Publication Date: 01/01/2016
Page(s): 498-502

Article Preview

Download Article