High Impact Factor : 4.396 icon | Submit Manuscript Online icon |

GSM Based Plc-Scada Burner Control System

Author(s):

Snehal S Maskare , AISSMS IOIT; Pragati S Kamble, AISSMS IOIT; Susmita S Pendse, AISSMS IOIT; Mr. V. S. Kamble

Keywords:

Programmable logic controller (PLC), Supervisory control and data acquisition (SCADA), Global system for mobile communication (GSM), Input-Output (I/O), Solenoid output valve (SOV), Push button (PB)

Abstract

The project involves remote monitoring of burner processes. The main objective is to keep in check various parameters involved in the heating processes. The PLC used in the project is GE Fanuc. SCADA system has been implemented so as to suit the operator with graphics of the processes being carried out. The project being GSM based, its motto is to keep the operator (if not present at the site or otherwise) aware of ongoing processes, faults occurring, the air-fuel ratio values etc. The innovation, which is to be developed, is to bring about a two way communication that is, to control the ongoing process, correct the fault via the cell phone or GSM device.

Other Details

Paper ID: IJSRDV3I1287
Published in: Volume : 3, Issue : 1
Publication Date: 01/04/2015
Page(s): 930-932

Article Preview

Download Article