Process Study, Cycle Time and Line Balancing of the Scooter Manufacturing Industry |
Author(s): |
| Karan.R , Dayananda Sagar College of Engineering Banagalore-560040; Dr.Vasantha Kumar.S.A, Dayananda Sagar College of Engineering Banagalore-560040 |
Keywords: |
| Process Study, Cycle Time, Line Balancing Introduction |
Abstract |
|
The project work contains the detailed study of process of assembly, cycle time and line balancing of assembles line. There are 3 Lines; they are Line 6, Line 7 and Line 8. I carried out my project work in Line 8. In each Line, there are different Zones. They are Sub sub assembly zone, Sub assembly zone, Floor conveyor zone, Main line zone, Repair zone. I carried out my study in the Sub assembly zone. The sub assembly zone has 35 stations; each station has a cycle time of 22 secs. A thorough study of the assembly line process is made and also cycle time study is done by taking 5 trails for each process. Average of the 5 trails is taken as the final cycle time for the particular process. Hence from the above study line balancing, non productive activity elimination and process distribution can be done. |
Other Details |
|
Paper ID: IJSRDV3I30739 Published in: Volume : 3, Issue : 3 Publication Date: 01/06/2015 Page(s): 2618-2620 |
Article Preview |
|
|
|
|