High Impact Factor : 4.396 icon | Submit Manuscript Online icon |

Minimize the Fluctuation in Labour Productivity using Primavera P6

Author(s):

Divyang K Solanki , LDRP-ITR, GANDHINAGAR; J.D.Raol, LDRP-GANDHINAGAR

Keywords:

Labour Productivity, Primavera P6

Abstract

Factors affecting Site productivity vary across sites depending on some external factors which include nature of work, location of site, prevalent laws of the technological advancement of the nation in construction and even the culture of the people. In India so many different cultured peoples are living so it affects much more rather than other effects. Any large construction work involves many professions workers as Architects, Engineers, Construction Management Consultants, and labours. In addition, materials and equipment suppliers and vendors and other support groups are involved. Considering the professional attitude and views, loss in productivity may result due to of failure of commitment from the groups. The main Objective of this project is to fluctuation in the productivity of the construction site.

Other Details

Paper ID: IJSRDV3I40076
Published in: Volume : 3, Issue : 4
Publication Date: 01/07/2015
Page(s): 25-27

Article Preview

Download Article