High Impact Factor : 4.396 icon | Submit Manuscript Online icon |

Delay Management with the Help of Algorithm based Scheduling Techniques

Author(s):

Nayan Dubasia , RK University, Rajkot; Krantisheel Nagrare, RK University, Rajkot; Chintan Raichura, RK University, Rajkot

Keywords:

Scheduling, Genetic Algorithm, Delay Management, Optimization

Abstract

In this research, an optimization technique was developed using Genetic Algorithms (GA) to optimize the schedule of construction project activities in order to minimize the total duration of the project. The GA procedure searches for an optimum solution and gives shorter duration, with minimum cost. The Genetic Algorithm was made in C programming. The results obtained by the optimization meet the goal of achieving the best schedule.

Other Details

Paper ID: IJSRDV3I40346
Published in: Volume : 3, Issue : 4
Publication Date: 01/07/2015
Page(s): 713-715

Article Preview

Download Article