High Impact Factor : 4.396 icon | Submit Manuscript Online icon |

Reducing the Cost of Live Bridge Project without Change in Time

Author(s):

Anil Pandey , S.A.T.I VIDISHA (M.P); Dr. Sanjay Bhandari, S.A.T.I VIDISHA (M.P); Divyang Jain, S.A.T.I VIDISHA (M.P); Gyanendra Kumar Chaturvedy, S.A.T.I VIDISHA (M.P)

Keywords:

Live Bridge, Time

Abstract

Many times Construction cost of any project increases due to some small activity and mistake sometime we neglected some activity which reduce too much cost of the project The main theme of the project is how to reduce the cost of live bridge construction with proper time the construction work is going on near Mahesh war. 60m bridge construction is going on having three piers and two abutment also provided retaining wall and cofferdams. Many factors are considered for reducing the cost of live bridge project we describe each factor and technique and calculate total reduced cost and finally decided total cost reduction of bridge in proper timing .for this project we need all the data, drawing, materials, and all type of costing of each part of bridge.

Other Details

Paper ID: IJSRDV4I30604
Published in: Volume : 4, Issue : 3
Publication Date: 01/06/2016
Page(s): 1302-1304

Article Preview

Download Article