Study of Advance Construction Techniques to Manage the Cost & Time Aspect for High Rise Building

Author(s):

Darshan Chetan Bhai Vyas , INDUS INSTITUTE OF TECHNOLOGY & ENGINEERING; Jitendra Patel, INDUS INSTITUTE OF TECHNOLOGY & ENGINEERING

Keywords:

High rise construction, Cost overrun, Time overrun, Advance construction techniques, Advance materials

Abstract

Time & Cost overruns has been a noteworthy issue in numerous Indian High rise construction projects. The successful execution of construction activities and keeping them within recommended plan and cost is imperative for compelling time execution and cost execution. This thesis work is done on concentrating on Reasons of Time & Cost overruns in Indian High Rise construction industry. A valid questionnaire for the overview was produced taking into account reasons for time & cost overruns recognized from writing survey. The information from the survey was broken down measurably. Construction project managers/engineers were surveyed to identify which construction activities in each category cause the most time & cost overrun. The result accomplished from the survey revealed that the major cause for time & cost overruns are during construction execution time only. Study of advance construction techniques and utilize for control the time & cost overrun.

Other Details

Paper ID: IJSRDV4I31019
Published in: Volume : 4, Issue : 3
Publication Date: 01/06/2016
Page(s): 1099-1102