Controllino Based System using GSM Based Automatic Substation Load Shedding and Sharing using Programmable Switching Control |
Author(s): |
| Anwar Nasir , NELUMBO POWER TECHNOLOGY PVT LTD; Junaid Azad Wani, ALBA PVT LTD; Chaitanya Jalandra, NELUMBO POWER TECHNOLOGY PVT LTD; Arvind Kumar Chauhan, NELUMBO POWER TECHNOLOGY PVT LTD |
Keywords: |
| Automation, Control System, Relays, Controllino (MAXI), SIM300Automation, Control System, Relays, Controllino (MAXI), SIM300 |
Abstract |
|
Our aim of this project is designed to control substation load shedding and sharing using a Programmable switching control by automatically. In this project we demonstrate the working of this simple operation using a Controlling (MAXI) .The development of this application requires the configuration of the Program through GSM module. In substation, there are many tasks like certain loads need to be switched ON/OFF in specific time intervals. In this, the loads can be operated in three modes: Set mode, Auto mode and Manual Mode. In set mode, through timers, the operation is based on input time set by the user where as in auto mode it works on default time settings and finally in the manual mode it functions while respective loads are operated Depending on the load necessity using GSM. All the modes and status of loads are displayed on an LCD. Finally GSM modem which sending sms to the control system we can select the mode and timing remotely. |
Other Details |
|
Paper ID: IJSRDV5I120343 Published in: Volume : 5, Issue : 12 Publication Date: 01/03/2018 Page(s): 556-558 |
Article Preview |
|
|
|
|
