Analysis and Implementation of Chute System to Obtain World Class OEE

Author(s):

Mehul. N. Nagdiya , IIST, Kadi, Ahmedabad.; Bhaumik N Patel, IIST, Kadi,Ahmedabad; Prof. Namrata Sengar, IIST, Kadi,Ahmedabad

Keywords:

OEE, Conveyor, Availability ratio, Performance ratio, Quality ratio, Chute Design, Analysis of Chute system, world class OEE

Abstract

A large investment in a piece of capital machinery and, in theory, it could run 24 hour a day for seven days a week at its optimum Speed. If it did this you gain the maximum value from the investment. In reality there is number of element that can affect the value gained from the investment. So that fully utilization of equipment can be done. Hence for fully utilization of any equipment any firm must have to calculate OEE. This paper represents the methodology applied in increasing the OEE of an Organization by exchanging the feed mechanism from a conveyor to a Chute system.

Other Details

Paper ID: IJSRDV5I21490
Published in: Volume : 5, Issue : 2
Publication Date: 01/05/2017
Page(s): 1608-1613

Article Preview

Download Article