Case Study on Cost Effective Alternate for Reducing Pavement Thickness after Pavement Analysis |
Author(s): |
| B Krishna Mohan , Sree Dattha Institute of Engineering and Science; P Rukesh, Sree Dattha Institute of Engineering and Science; Dr. KSR Murthhy, Sree Dattha Institute of Engineering and Science |
Keywords: |
| Pavement Condition, BBD, Bump Integrator, Benkelman Beam Deflection |
Abstract |
|
The traffic is increasing day by day leading it to the damage of the surface of the pavements and therefore there is a need to rehabilitate them before the road condition gets severe. Pavement evaluation should be done to know the nature, severity and extent of the road deterioration. The pavement needs to be evaluated every 5 years for Rehabitation/Repairing or Reconstruction along the project stretch. For the Reconstruction of any section it takes a huge cost. To overcome the cost we stabilize that section with terraZyme and finish it within less time and affordable cost and it is environmental friendly also. A project Section is selected in this research then laboratory and field tests are done for implementing terrazyme in reconstruction. |
Other Details |
|
Paper ID: IJSRDV5I70351 Published in: Volume : 5, Issue : 7 Publication Date: 01/10/2017 Page(s): 686-690 |
Article Preview |
|
|
|
|
