High Impact Factor : 4.396 icon | Submit Manuscript Online icon |

Equipment Management in Construction Industry

Author(s):

Harshal Sanap , S.N.D College of Engineering & RC Yeola. ; Akshay Salunke, S.N.D College of Engineering & RC Yeola. ; Bhushan Darade, S.N.D College of Engineering & RC Yeola. ; Amay Paithankar, S.N.D College of Engineering & RC Yeola. ; Prof. Gawali N. B., S.N.D College of Engineering & RC Yeola.

Keywords:

Equipment Selection, Equipment Management, Maintenance, Timely Project Completion, List of Equipment, Activity of Building Construction

Abstract

In this paper, we discuss about the recently collected data of site plan at locations of ambad in nashik district and its practical analysis on site for equipment management. Further, we analyze the effective use of equipment on site and to saving the time and cost and increase the speed of construction. Further find out the results and conclusion of the project.

Other Details

Paper ID: IJSRDV6I21435
Published in: Volume : 6, Issue : 2
Publication Date: 01/05/2018
Page(s): 2145-2148

Article Preview

Download Article