Lean Construction Techniques for Reduction of Waste and Performance Improvement in Construction Project |
Author(s): |
| Suraj Shivaji Shinde , Trinity Academy of Engineering Pune; Prof. Deshmukh S. S., Trinity Academy of Engineering Pune; Prof. Ghorpade K. H, Trinity Academy of Engineering Pune |
Keywords: |
| Lean Construction, Quality Waste, Questionnaire Survey, Last Planner System, PPC |
Abstract |
|
In construction, lean techniques are used to reduce waste and increase productivity. Lean enterprise is to achieve owner expectations through the use of the absolute minimum amount of sources. This is achieved by continuous process of identification and elimination of waste through a systematic approach The aim of the research is to implement the lean thinking in an ongoing construction project This research is mainly divided into two phases 1) questionnaire survey to identify the waste in construction 2)implementation of last planner system is. |
Other Details |
|
Paper ID: IJSRDV6I50432 Published in: Volume : 6, Issue : 5 Publication Date: 01/08/2018 Page(s): 820-824 |
Article Preview |
|
|
|
|
