High Impact Factor : 4.396 icon | Submit Manuscript Online icon |

A Critical Review on Project Management Techniques: PERT and CPM

Author(s):

Dr. Pratibha Pant , Guru Nanak Dev Engineering College Bidar

Keywords:

PERT/CPM, Network diagram

Abstract

Project Evaluation and Review Technology (PERT) and Critical Path Method (CPM) are vital techniques for the planning, scheduling and managing large projects in terms of cost, path and time. The CPM and PERT is a fundamental technique developed for project management assuming under the unlimited resource availability. The practical problem of allocating resources over the time to perform collective tasks arises in a variety of situation and frequency the scheduler must take account of the trade-off between availability of resources and activity duration. To solve these problems use of mathematical models could not solve bigger or complex problems. The scheduling of tasks and the allocation of resources in medium to large schedule projects is an extremely hard problems and challenges of project management due to its complexity and therefore PERT and CPM are ideal solutions.

Other Details

Paper ID: IJSRDV7I110142
Published in: Volume : 7, Issue : 11
Publication Date: 01/02/2020
Page(s): 70-71

Article Preview

Download Article