High Impact Factor : 4.396 icon | Submit Manuscript Online icon |

Analyze Impact of Changed Cost on Actual and Planned Cost at Brownfield Construction Site

Author(s):

Mrunali M. Ghumare , D Y Patil college of engg Akurdi, Pune; Ashok More, D Y Patil college of engg Akurdi, Pune; Ashwini Patil, D Y Patil college of engg Akurdi, Pune

Keywords:

Construction, Brownfield Project, Change Management. Change Cost

Abstract

Construction Industry contributes massively towards the economy of India. In accordance with the need and objectives of the project, construction can be Greenfield (construction on land) construction or brownfield (redevelopment of existing structure) construction. This study focuses on the Brownfield scope of construction and the changes that take place at the time of demolition and construction of structure during planning and execution phase. These changes may impact on project in positive or in negative way. Cost of these changes should be managed and control to avoid its impact on total project cost. This studies help to know the contribution of change cost in actual cost, planned cost and total project cost.

Other Details

Paper ID: IJSRDV7I20942
Published in: Volume : 7, Issue : 2
Publication Date: 01/05/2019
Page(s): 1203-1206

Article Preview

Download Article