High Impact Factor : 4.396 icon | Submit Manuscript Online icon |

Delay Analysis : By using RII Method

Author(s):

Abhishek Sudhakar Shelke , PD.VASANTDADA PATIL COLLEGE OF ENGINEERING,PUNE; Sagar S. Ambure, PVPIT,PUNE, PVPIT,PUNE

Keywords:

Delay Analysis, GST Effect on Construction Industry, RERA Effect on Construction Industry, Demonetization Effect on Construction Industry

Abstract

Delay is the most common term in construction industry in India. Construction industry plays the vital role in the Indian economy. There are various reasons for the delay, from the last few decades researcher search the various techniques to analyses the delay. Delays in construction projects are quite expensive, sometimes they may result in sever damages to the involved parties. This dissertation focuses on study of core factor that are causing delays and analyzing the day to day records to minimize delay. But in India 2016, Indian construction industry has found that the delay reasons due to change in the system parameter, where it contains the various aspects to analyze the causes of delay. Indian government has announced the new law of GST, RERA (Real estate regulatory Authority) and demonetization it causes the dramatic change in the Indian construction industry. The current case study is undertaken on construction of new residential project in Pune. The project is construction of one residential building and is scheduled to complete in 12 months. The study is being conducted on various factors that were causing the delay in project.

Other Details

Paper ID: IJSRDV7I50315
Published in: Volume : 7, Issue : 5
Publication Date: 01/08/2019
Page(s): 446-451

Article Preview

Download Article