Resources, Cost Planning and Time Delays in Assembly Building

Author(s):

Shahana Sherin P , Shree Venkateshwara Hitech Engineering College; A Sabareesh, Shree Venkateshwara Hitech Engineering College

Keywords:

Resources, Cost Planning, Time Delays, Assembly Buildings

Abstract

The Indian construction industry is an integral part of country's economy and its growth and a conduit for a substantial part of India's development investment. The industry plays a pivotal role in developing the country's infrastructure, a pre-requisite for high levels of economic growth. Therefore there is a requirement of a certain techniques such for the total management of projects. The current study consists of the computer based Project Management software Primavera for the Planning, Scheduling and Allocation of resources for assembly buildings. Delays are a major concern in such projects even after a perfect planning. It is loss of time and money. This study also identifies the factors of delays and a model for future construction.

Other Details

Paper ID: IJSRDV9I50067
Published in: Volume : 9, Issue : 5
Publication Date: 01/08/2021
Page(s): 52-54

Article Preview

Download Article